Service Beide Service
Service Service

Canada Prevents Children From Opening CSA Z76.1

Product introduction: To determine compliance with the requirements of this standard, assessments of CRP models for resistance to children and for efficacy in advanced adult use should be performed on either a full protocol or a sequential protocol.(1) Selection agreementThe test protocol should be selected before the test begins. Changes to the test protocol are not allowed.(2) Complete protocol testFull protocol testing for resistance efficacy in children and efficacy in advanced adult use should be performed in accordance with Chapter 8. Results shall be recorded and evaluated as specified in Clauses 6 and 10. Instead of a complete scheme, a sequential scheme can be used.(3) Sequential protocol testSequential protocols are only available for child resistance and advanced adult efficacy testing may notExecute in order. Sequential protocol testing should be performed in accordance with Chapter 8. Results shall be recorded and evaluated in accordance with clauses 6 and 9.NOTE: Sequential protocol testing has been developed as an alternative to full protocol testing. It reduced the number of children tested by using statistical trend analysis.(4) Similar models for evaluating child protective bagsModels in the CRP series can be tested individually or in arrays as specified in Chapter 11.(5) Test items5.1. Physical test5.2. Life testLife testing (see clause 12.3) shall be performed during the initial evaluation of the CRP model.5.3 Leak testLeak testing shall comply with the following requirements (see clause 12.4):a) Trials should be performed during the initial evaluation of the CRP model and only for CRPs intended for use in liquid formulations.b) When tested in accordance with 12.4, the pass/fail criteria of Table 2 and applicable Table 3 apply.
Project introduction: Canada Prevents Children From Opening CSA Z76.1 Test
Application description: Telephone consultation.
Expected cycle: 20 working days
Latest offers:
Canada Prevents Children From Opening CSA Z76.1
  • Project description
  • Customer case
  • Certification application

加拿大防止儿童打开 CSA Z76.1


To determine compliance with the requirements of this standard, assessments of CRP models for resistance to children and for efficacy in advanced adult use should be performed on either a full protocol or a sequential protocol.

(1) Selection agreement
The test protocol should be selected before the test begins. Changes to the test protocol are not allowed.

(2) Complete protocol test
Full protocol testing for resistance efficacy in children and efficacy in advanced adult use should be performed in accordance with Chapter 8. Results shall be recorded and evaluated as specified in Clauses 6 and 10. Instead of a complete scheme, a sequential scheme can be used.

(3) Sequential protocol test
Sequential protocols are only available for child resistance and advanced adult efficacy testing may not
Execute in order. Sequential protocol testing should be performed in accordance with Chapter 8. Results shall be recorded and evaluated in accordance with clauses 6 and 9.
NOTE: Sequential protocol testing has been developed as an alternative to full protocol testing. It reduced the number of children tested by using statistical trend analysis.

(4) Similar models for evaluating child protective bags
Models in the CRP series can be tested individually or in arrays as specified in Chapter 11.


(5) Test items

5.1. Physical test
5.2. Life test
Life testing (see clause 12.3) shall be performed during the initial evaluation of the CRP model.

5.3 Leak test
Leak testing shall comply with the following requirements (see clause 12.4):
a) Trials should be performed during the initial evaluation of the CRP model and only for CRPs intended for use in liquid formulations.
b) When tested in accordance with 12.4, the pass/fail criteria of Table 2 and applicable Table 3 apply.


加拿大防止儿童打开 CSA Z76.1

Hot Products / Popular search: More
2018 - 02 - 28
1. Introduction to CE certification'CE' mark is a safety certification mark, which is regarded as the passport opened by the manufacturer and entered the European market. CE stands for the logo of European unified CE certification (conform Europeenne). All products with 'CE' mark can be sold in EU member states without meeting the requirements of each member state, so as to realize...
2018 - 01 - 30
European unionCE certification, EU ERP certification, EU REACH certification, EU ROHS certification, EU ENEC certificationGermanyTUV South Germany related certification, Germany WEEE certification, Germany GS certificationBritainUK BSI certification UK ukca certificationFranceFrench NF certificationFour Nordic countriesNordic certificationNetherlandsKema certification in the NetherlandsAustriaAust...
2017 - 06 - 09
Certification Content SummaryASTM was formerly known as the International Association for Testing Materials (IATM).In the 1880s, in order to resolve the opinions and differences between buyers and suppliers in the process of purchasing and selling industrial materials, it was proposed to establish a technical committee system, and the technical committee would organize representatives from all asp...
2017 - 06 - 09
Introduction to IEC CertificationThe IEC standard is the International Electrical Commission (International Electrical Commission), which is a worldwide organization for standardization composed of electrotechnical commissions of various countries. Its purpose is to promote the standardization of the world's electrical and electronic fields. The origin of the International Electrotechnical Com...
  • About Beide
    • Company profile
    • Corporate culture
    • Service area
    • Development path
    • Laboratory overview
    • Talent recruitment
  • Beide Services
    • Global certification
    • Testing service
    • System service
    • EU authorized agent
    • Registration service
    • Metrological calibration
    • Factory audit service
  • News Information
    • Company news
    • Industry news
    • Employee activities
  • Resource center
    • Publicity album
    • Certification body
    • Certificate template
  • Certificate query
    • Certificate query
    • Application form download
    • Case progress
    • Third party certificate check
  • Contact us
    • Contact information
    • Online message
CONTACT US
WeChat
Official Account
Free consultation hotline
400-6288-211
Address: 6 / F, building e, hourui third industrial zone, Xixiang, Bao'an District, Shenzhen
Copyright ©2022 - 2025 Shenzhen Beide Technology Testing Co., Ltd
犀牛云提供云计算服务
var _kc_userID="169296";